World News
NDTV News Search Records Found 1000

Nepal Principal Tells NDTV How He Saved 900 Children From Floods In Minutes

Source Entity

NDTV News Search Records Found 1000

September 1, 2026
Nepal Principal Tells NDTV How He Saved 900 Children From Floods In Minutes

Devastating floods in Nepal have left over 900 people missing, primarily at hydropower project sites. Rescue operations are ongoing, involving elite mountain guides and international technical assistance to reach workers trapped in mud-choked tunnels.

Nepal's Hydropower Crisis: A Race Against Time

The recent catastrophic flooding in Nepal has evolved into a dire humanitarian emergency, with over 900 individuals currently unaccounted for, many of whom are workers at various hydropower projects across the region. The disaster has resulted in 810 confirmed deaths across Nepal and Tibet, marking a significant tragedy for the Himalayan nation. As the search intensifies, the focus has shifted toward the inaccessible tunnels of facilities like the Upper Trishuli-3A and the Chilime hydropower project, where workers were trapped by rapidly rising waters and debris.

The Engineering and Rescue Challenge

The logistics of the rescue operation are exceptionally complex. In the Rasuwa district, conventional rescue methods have proven insufficient due to the destruction of critical road infrastructure. To combat this, authorities have deployed elite personnel, including Everest veterans and IFMGA-certified mountain guides. These specialists are utilizing their unique expertise in rope fixing, helicopter longline operations, and navigating unstable terrain to reach isolated disaster zones. Despite pushing 120 meters into a mud-choked tunnel, progress remains slow due to thick sludge and debris, necessitating heavy excavation equipment.

Impact on Hydropower Infrastructure

Hydropower projects are the backbone of Nepal’s energy sector, but their location in steep, river-fed valleys makes them uniquely vulnerable to flash floods. The sheer scale of the missing persons—reported as 933 by the NDRRMA—highlights the vulnerability of these remote work camps. The tragedy is further compounded by the loss of staff members who were on duty when the floods hit, including reports of school personnel who perished while safeguarding students. The Independent Power Producers' Association Nepal continues to coordinate data on the hundreds of unaccounted workers across nine distinct projects.

International Cooperation and Technical Support

The scale of the disaster has prompted international cooperation, particularly with India. Given that several Indian nationals are among the missing, the Indian government has provided essential technical and relief assistance to bolster the Nepalese Army’s efforts. This cross-border collaboration is vital for the Upper Trishuli-3A site, where rescue teams have successfully located the tunnel's crown head and are working to widen access points to deliver oxygen and attempt extraction.

Future Trends and Disaster Preparedness

This event underscores the urgent need for enhanced disaster resilience in the Himalayan region. As climate patterns become increasingly unpredictable, the intersection of rapid infrastructure development and geological instability requires a re-evaluation of safety protocols for hydropower projects. Future trends will likely necessitate mandatory early-warning systems, more robust tunnel reinforcement, and the integration of specialized mountain rescue units into standard disaster management frameworks. The current focus remains strictly on the recovery of survivors, but the long-term impact on Nepal's energy sector and regional safety standards will be profound.

Verification Required?

Read the full report from the primary source

Go to NDTV News Search Records Found 1000