Business
India Latest News: Top National Headlines Today & Breaking News | The Hindu

Bi-weekly special trains between Tirupati and Vizag extended till January 29, 2027

Source Entity

India Latest News: Top National Headlines Today & Breaking News | The Hindu

November 26, 2026
Bi-weekly special trains between Tirupati and Vizag extended till January 29, 2027

South Coast Railway has extended bi-weekly train services between Tirupati and Visakhapatnam through January 2027 to manage festival demand. Simultaneously, tenders have been floated for the ₹4,299-crore Bikkavolu-Duvvada rail expansion project to reduce regional congestion.

Enhancing Connectivity: South Coast Railway's Strategic Expansion

The South Coast Railway (SCoR) has announced a significant extension of its bi-weekly special train services connecting the pilgrimage hub of Tirupati and the industrial port city of Visakhapatnam. By extending these services—specifically Train No. 08509 and 08510—through January 2027, the railway authority is proactively addressing the heightened passenger volume typically observed during the Indian festival season. This move ensures that commuters traveling between these two vital Andhra Pradesh cities have consistent transport options through the winter months.

Operational Logistics and Route Coverage

These special trains are designed to provide extensive regional connectivity, traversing key transit points including Renigunta, Guntakal, Guntur, and Vijayawada. By maintaining a schedule that runs on Sundays/Thursdays (Tirupati-Vizag) and Mondays/Fridays (Vizag-Tirupati), the SCoR is effectively balancing the demand for both outbound and return travel. This operational continuity is essential for managing the 'extra rush' that characterizes long-distance rail travel in India during the holiday period.

Investing in Infrastructure: The Bikkavolu-Duvvada Corridor

Parallel to these service extensions, the SCoR Construction department has launched a massive infrastructure initiative: the Bikkavolu-Duvvada third and fourth broad-gauge rail line project. Valued at ₹4,299.12 crore, this 151-km stretch is a critical component of the broader Nidadavolu-Duvvada quadrupling corridor. This project aims to alleviate the chronic saturation of the Chennai-Howrah trunk route, which serves as one of the most vital arteries of the Indian rail network.

Strategic Implications for the Chennai-Howrah Trunk Line

The Chennai-Howrah route is notorious for its high traffic density, often leading to bottlenecks that delay both passenger and freight services. By quadrupling the track capacity, the SCoR expects to significantly improve train punctuality and freight throughput. The ₹9,889-crore overarching project reflects a long-term commitment to modernizing the railway infrastructure in the Andhra Pradesh region, facilitating smoother transit between major economic hubs.

Tendering and Future Outlook

With the pre-bid conference scheduled for December 23, 2026, and the bidding window opening in early 2027, the SCoR is adhering to a structured timeline to ensure the project meets its 45-month completion goal. The Engineering, Procurement, and Construction (EPC) model chosen for this project highlights a focus on efficiency and accountability. As these projects materialize, the combination of increased temporary services and permanent infrastructure growth signals a transformative period for the region's rail connectivity, promising long-term benefits for both local commuters and national logistics chains.

Verification Required?

Read the full report from the primary source

Go to India Latest News: Top National Headlines Today & Breaking News | The Hindu