Mumbai’s first bridge to Navi Mumbai is rusting, and nobody wants to own it
Source Entity
Sabah Virani

The historic Thane Creek Bridge-1, Mumbai's first link to Navi Mumbai, is falling into disrepair due to jurisdictional neglect. Caught in a bureaucratic custody battle, the structure remains abandoned as newer bridges handle the region's massive traffic flow.
The Silent Decay of Thane Creek Bridge-1
Opened in 1973, the Thane Creek Bridge-1 served as the vital lifeline connecting the densely populated Mankhurd region of Mumbai to the burgeoning planned city of Navi Mumbai. At the time of its inception, it represented a monumental engineering milestone, designed to alleviate the crushing urban pressure on Mumbai by facilitating expansion across the creek. Today, however, that legacy is hidden behind layers of rust and neglect, as the structure sits boarded up and largely forgotten by the millions of commuters who traverse the newer, modern spans constructed alongside it.
A Monument to Bureaucratic Stasis
The current state of the bridge is defined by a complex 'custody battle' between various government authorities, none of whom seem willing to claim ownership or responsibility for its maintenance. This jurisdictional limbo has left the bridge to succumb to the elements, with weeds overgrowing the deck and road signage rendered illegible by time and exposure. The structure, once the primary artery for regional transport, has been relegated to a ghost of its former self, serving only as a precarious fishing spot for locals rather than a functional piece of infrastructure.
The Shift in Infrastructure Priorities
The decline of the original bridge is symptomatic of a broader shift in urban planning priorities within the Mumbai Metropolitan Region. As the city expanded, the need for higher-capacity, modern infrastructure led to the construction of two newer bridges that now dominate the crossing. These newer spans effectively rendered the original 1973 structure obsolete, yet the failure to decommission, repurpose, or properly maintain the historic bridge highlights a significant gap in long-term infrastructure life-cycle management.
Environmental and Safety Implications
Beyond the aesthetic decay, the abandonment of the bridge presents potential environmental and safety concerns. As the structure continues to rust and degrade, the lack of oversight regarding its physical integrity and the accumulation of debris—including garbage left by irregular visitors—poses a challenge to the local ecosystem of the Thane Creek. The bridge, which was intended to be a symbol of progress, now stands as a cautionary tale regarding the maintenance of legacy infrastructure in rapidly developing urban environments.
Future Outlook and Urban Challenges
The ongoing custody battle over the bridge reflects a systemic struggle between state and local bodies in managing aging assets. Without a clear directive on whether the bridge should be restored as a heritage site, repurposed for pedestrian use, or safely demolished, it will likely continue to deteriorate. The case of Thane Creek Bridge-1 serves as a stark reminder that the lifecycle of major infrastructure extends far beyond the ribbon-cutting ceremony, requiring sustained political and financial commitment to ensure public safety and urban order.